OUR REFERENCES

Thanks to its reliability, the quality of its work and the expertise of its staff, HYDRO-GAZ managed and carry out all the work and projects that have been entrusted to him and whatever their volume and importance. 

 

SUPPLY AND INSTALLATION OF UNDERGROUND PIPE DN 160.

2002 To   2003                               

 
 

 

FRAMEWORK CONTRACT FOR THE HIRE OF LABOUR SPECIALISING IN WELDING WORK (RENEWABLE CONTRACT FOR EVERY 2 YEARS)

2002

to

2011

 
 

PIPING SERVICES AND MECHANICAL WORKS MAAMOURA EL BARAKA.

2010

to

2013

 
 

 

FIRE FIGHTING LINES ( Works In HDPE)

 

2012

 
 

PREPARATION, INSTALLATION AND CONNECTION OF CONNECTING LINES BETWEEN TANKS.  

2014 

To

2015

 
 

 

PIPING SERVICES AND MECHANICAL WORKS IN MAAMOURA EL BARAKA ON REQUEST.

 

2016

 
   CENTRAL WELD WORK ON THE ROADWAYS AND SUBS (WORK IN PROGRESS)

2018

To

2020

 
 

REPLACEMENT OF A SECTION OF THE FIRE NETWORK AT THE BASE OF TRAPSA IN SKHIRA EN PEHD DN 160. 2019  
 

 

 FIRE NETWORK EXTENTION ( 950ML HDPE Works).

 

2019

To

2020

 

INSTALLATION OF PIPELINE LINES, INSTALLATION,ASSEMBLY,TESTING AND COMMISSIONING OF EQUIPMENT (FILTERS AND ACCESS PLATFORMS AND HOISTS), PIPING, WICKERWORK, PIPE RACK AND SUPPORTS FOR THE MELLITAH COMPLEX ZUWARAH LIBYA GAS FILTER INSTALLATION PROJECT. 2019  

 

WORK TO REPLACE LINES LINKED TO THE TOPPING UNIT. 2021  
S.E.G.P.R CONSTRUCTION WORK OF SUPPORTS FOR PRODUCT RECEIVING LINES BY SHIPS, AT THE OIL QUIT OF RADES- CIVIL ENGINEERING AND METAL STRUCTURE. 2021  

 

INSTALLATION OF NEW LPG GAS TANKS AT THE AGIL GAZ ZARZOUNA-BIZERTE FILLING CENTER AND FIRE PROTECTION NETWORK COMPLIANCE.

2021 To 

2022

 

1- Laying pipeline lines, Installation, assembly, testing and commissioning of equipment (filters and access platforms and hoists), piping, basketwork, pipe rack and supports for the gas filter installation project at Mellitah Complex Zuwarah Libya (3km: 4''Sch40; 6km: 6''Sch80 and 2.5km: 12''Sch40).

2- Maintenance work: cleaning, repair and welding of the damaged tank No. 1 with a capacity of 313,000 bbls, 200 feet. Outside diameter x hull height of 56 feet at Es-Sider tank farm and tank No. 17 with a capacity of 500,000 barrels with a nominal diameter of 260 feet by a nominal height of 56 feet.
2019 to 2020  
PIETRO FIORENTINI Natural gas supply to Perle Lac subdivision 2019  
Natural gas supply BORJ EL AMRI and gabes 2023  
PROVISION OF TIE-INS STATIONS CONSTRUCTION SERVICES 2024